Installation of a fuel control system on a stationary diesel facility - a trailer concrete pump

Equipment to be installed:

  • high-precision GPS/GSM tracker "SOKIL-TRACK" of our production,
  • fuel consumption sensor.

Initial tasks-

CONTROL:

  • Fuel consumption directly during concrete pumping,
  • real-time location,
  • idle time of the equipment,
  • concrete pump operating time.

The installation time of the equipment is 180 minutes.