Installation of a fuel control system on a stationary diesel facility - a trailer concrete pump
Equipment to be installed:
- high-precision GPS/GSM tracker "SOKIL-TRACK" of our production,
- fuel consumption sensor.
Initial tasks-
CONTROL:
- Fuel consumption directly during concrete pumping,
- real-time location,
- idle time of the equipment,
- concrete pump operating time.
The installation time of the equipment is 180 minutes.